Islington Wharf Apartments – Ph.2 (Rebuild) – Manchester

Share this on

Division

Electrical Engineering Services

Contract

Design & Build

Value

<£1.5m

Completion

Winter 2018

Project: Islington Wharf Apartments – Ph.2 (Rebuild) – Manchester

Overview

Eric Wright Construction undertook the re-build of this existing apartment development to replace structural and general build elements.

Scope of Work

West Lancashire Group were appointed to complete the Design & Installation of the full spectrum of MEP engineering services, working as part of successful project team.
A key element for the development was the clients requirement to retain key items of plant and equipment during the works.

Other Residential Projects

Luxury Homes

Ousel Nest – Bolton (Mr & Mrs G Neville)
St Johns House – Manchester (Mr & Mrs G Neville)
Primrose Hill – Poulton le Fylde (Chairman FTFC)
Salisbury House – Preston (Chairman Forrest Construction)

Projects are referenced to provide further supporting insight into the MEP high-quality approach and finishes detailing required for these luxury homes.

Completed to the full satisfaction of our clients.

More info

Salford – Wellington Street Apartments

Northold Group, completed this residential development to deliver these spacious apartments located within Salford

More info

Islington Wharf Apartments – Ph.3 – Manchester

Eric Wright Construction undertook this £15m, residential development to deliver 101 no apartments/townhouses across over 3 blocks around a central courtyard.

More info

Simpson Street Apartments – Manchester

New build MEP Design & Build for 66 no apartments, including ancillary space and sub-basement car park located within the Northern Quarter of the city centre.

More info

Phoenix Apartments – Manchester

New build MEP Design & Build 75 no apartments, with exposed concrete frame facilitating design and installation challenges to ensure exposed MEP services are detailed to provide a featured installation aligned to the building fabric and architectural detailing.
All key MEP systems interfaced to adjacent Mill Building for ease of site management.

More info

Bengal Street – Manchester

New build 75 apartments with feature roof top gardens, basement car park, including offices to the lower floors.

As exposed concrete frame facilitated design challenges due to the exposed nature of the MEP services. Fully detailed utilising Revit/BIM to provide a featured installation aligned to the building fabric and architectural detailing.

More info