QES Studio – Kirkby Lonsdale
Description:
All MEP Design & Installation works completed in-house utilising Revit/BIM level 2 including COBie to Department of Education standards.
Contract:
Design & Build
Value:
<£1m
Completion:
August 2019
Client Comments
West Lancashire Group were chosen to do the electrical, mechanical and passive network installation at Queen Elizabeth Studio School. Right from the start, their Director, Chris, impressed with his positive attitude and constructive suggestions, whilst also having a keen eye on the detail.
The work was carried out to a very high standard, to budget, and on time. I would very much look forward to working with West Lancashire Group again.
Jim Williams | Network Manager | Queen Elizabeth School
West Lancashire Group were chosen to do the electrical, mechanical and passive network installation at Queen Elizabeth Studio School. Right from the start, their Director, Chris, impressed with his positive attitude and constructive suggestions, whilst also having a keen eye on the detail.
The work was carried out to a very high standard, to budget, and on time. I would very much look forward to working with West Lancashire Group again.
Jim Williams | Network Manager | Queen Elizabeth School
Like this article
Project Overview
New Build MEP Design & Build to create a new ESFA Studio School facility within the schools existing campus, including the integration of key MEP systems.
Scope of Works
All MEP Design & Installation works completed in-house utilising Revit/BIM level 2 including COBie to Department of Education standards.