Multi-Ply Head Office, Blackpool
Share this on
Division
Initial enabling /services works and fit out of industrial unit with mechanical and electrical services to serve manufacturing equipment
Contract
Design & Build
Value
£1.5m
Completion
Summer 2022
Project: Multi-Ply Head Office, Blackpool
Overview
WLG secured the £1.5m contract to deliver the mechanical and electrical installation at Multiply’s head office for Eric Wright Group.
The team delivered the project in two phases. During Phase One, they installed water, gas, hydrant and electrical infrastructure within the new building shell.
In Phase Two, they completed the full M&E fit-out. Works included containment and sub-main distribution. The scope also covered lighting, emergency lighting and external lighting. The team installed small power and structured cabling systems. They delivered fire alarm, intruder alarm and BMS systems. Installations also included disabled refuge and disabled toilet alarms.
Mechanical services included gas, cold water and domestic hot and cold water systems. The team installed fire hydrant pipework and steam boiler plant. They delivered heating, air conditioning and ventilation systems. The scope also included compressed air services and full thermal insulation.